Producción sostenible de biofertilizantes y biogás a partir de desechos de materia orgánica. Gran Canaria
The plant, located in the municipality of Agüimes, in Gran Canaria, is expected to come into operation in October 2025, at which time a three-month operational test phase will be carried out to guarantee the efficiency and safety of the process. The implementation to obtain emission reductions is estimated in the first quarter of 2026. This first plant will be located next to the Southeast treatment plant, in the port free zone of Gran Canaria, which will facilitate its logistical integration and connectivity with distribution channels. It will be designed to manage up to 31,000 tonnes of organic waste per year, from which approximately 2,242 tonnes of biomethane per year will be produced, equivalent to 31,141 MWh of energy. This production of this energy vector represents a sustainable alternative to about 2,832 tons of propane gas, which will allow a significant reduction in the use of fossil fuels and polluting gas emissions and contribute to local climate and energy governance. As for the size and scope of the activity of the facility, it is estimated that it can serve some 45-65 hotels since the capacity of the digester, is 31,000 t/y of organic waste. Among the key component
Registry page →Methodology price benchmark
Weekly average USD/tCO2e for Biogas - Heat from the CIP price index.
No index history yet for this methodology.
Issuance vs retirement by year
Built from 0 normalized ledger events (0 issuance, 0 retirement).
No ledger events synced for this project yet. Feeds refresh daily — see feed status.
Peer projects — same methodology
Inquire about supply from this project
Submit a matching inquiry — we route to MBSB Markets.
Start an inquiry