Back to Companies
2°C aligned
CS_VOE_VI · Vienna Stock Exchange · EMEA
voestalpine AG
VOE.VI·Cement & Steel·Specialty steel plus green steelA+Risk: Low
Linz EAF startup
CIP Price · Simulated
120.27
-6.82% · 3M
Source: seeded estimate
Key scores and index weight
CIP Score
86.0
C100 · Rank #0 of 100
Carbon Score
86
Track Linz EAF startup
Sentiment
0
net controversy-weighted
Index Weight
0.00%
quarterly rebalance
Price history and score profile
Price history
120.27
-6.82%
Loading…
Score profile · 8 dimensions
Sentiment trend and carbon flows
Sentiment trend · 60d
Carbon flows
- Credits Produced0 k tCO₂e
- Credits Retired0 k tCO₂e
- Financial Strength0 / 100
- Innovation Score0 / 100
- Transition Score84 / 100
- Quality Score84 / 100
DATA TIER · Extended · Cement & Steel
Sector peers
Sector peers — Cement & Steel
View full index →| # | Company | Grade | Score | Weight | 24h |
|---|---|---|---|---|---|
| 175 | C5234 Forestry Holdings 234 | A+ | 86.0 | 0.20% | -0.35% |
| 156 | C5075 Renewabl Holdings 75 | A+ | 86.1 | 0.20% | -0.5% |
| 194 | C5351 Renewabl Holdings 351 | A | 86.2 | 0.20% | +0.67% |
| 155 | C5403 EVBatter Holdings 403 | A+ | 86.4 | 0.20% | -0.45% |
| 160 | MP MP Materials | A+ | 86.4 | 0.20% | +0.79% |
Fundamentals and technicals
Fundamentals
no public financialsMarket CapN/A
Revenue (TTM)N/A
P/E RatioN/A
EPS (TTM)N/A
Dividend YieldN/A
BetaN/A
Gross MarginN/A
HeadquartersAustria
Listed (IPO)N/A
EmployeesN/A
IndustryCement & Steel
ExchangeVienna Stock Exchange · VOE.VI
Scope 1+2 (kt)N/A
Scope 3 (kt)N/A
No public financial data available for this entity. Carbon-specific scores are CIP-curated.
Technicals
no public quoteN/A
N/A
OpenN/A
Prev CloseN/A
Day RangeN/A
52w RangeN/A
VolumeN/A
Avg VolumeN/A
SMA 20N/A
SMA 50N/A
SMA 200N/A
RSI (14)N/A
MACD / SignalN/A
Volatility (30d)N/A
Sustainability & CDP profile · voestalpine AG
Curated, on-demand from the Carbon Index Protocol database.
Loading profile…
SBTi Target Module · voestalpine AG
Calculated 1.5°C-aligned target stack · Absolute Contraction Approach · base year 2020.
SBTi status
Committed
Letter of commitment filed
Net-zero year
2038
Residual ≤10% via removals
Required pace
-5.00%/yr
Modelled: -2.62%/yr
Near-term · 2030
Scope 1+2 base1,620 kt CO₂e
Scope 1+2 target (-42%)940 kt CO₂e
Scope 1+2 today1,380 kt CO₂e
Scope 3 target (-25%)64,093 kt CO₂e
Long-term · 2038
Total base (S1+2+3)87,077 kt CO₂e
Net-zero target (-90%)8,708 kt CO₂e
Total today77,954 kt CO₂e
Ambition gap+2.38 pp/yr
Decarbonisation pathway
Total scope 1+2+3 trajectory · 2020 → 2038 · kt CO₂e
SBTi 1.5°C required Modelled trajectory
- ›Methodology: SBTi Absolute Contraction Approach, 2020 base year, 1.5°C pathway.
- ›Scope 1+2 near-term: 4.2%/yr linear (= 42% by 2030).
- ›Scope 3 is material (>40% of footprint) — SBTi requires near-term 2.5%/yr scope 3 reduction.
- ›Long-term: -90% absolute by 2038; residual ≤10% neutralized by durable removals.
Data provenance & validity
Methodology is valid — calculations follow the SBTi Corporate Net-Zero Standard v1.2 (Absolute Contraction Approach: −4.2%/yr scope 1+2, −2.5%/yr scope 3, 90% absolute reduction by net-zero year).
Inputs are modelled, not audited disclosures. Scope 1/2/3 baselines, net-zero year, and SBTi status are deterministically derived per ticker from fundamentalsFor() in src/lib/ci100-fundamentals.ts (seeded by ticker + transition score). Replace with CDP / company-disclosed inventory data for verified results — wire real values into fundamentalsFor() and this module recomputes automatically.
External research · voestalpine AG
Markets & filings
Climate disclosures
Market data unavailable — showing v0 seeded estimates. ESG grade, CIP score, sentiment and carbon flows are Carbon Index Protocol curated data, not market data.