← Rankings
Gold Standard · GS5223via Gold Standard — Project Registry

Battery Storage Hybrid Renewable Energy Project by Hero Future Energies in Andhra Pradesh

The purpose of the project is to generate electricity by harnessing the solar and wind energy by using solar photovoltaic & Wind turbine generator technologies and there by feed the generated electricity to the Indian national grid. Project involves the installation of 60 MW Solar Photovoltaic Power Plant & Wind power plant combined with BESS (60 MWh) in Uruchinthala, Tadipatri Tehsil, Dist. Anantapur, Andhra Pradesh. The project is yet to be commissioned and the generated electricity will be continuously supplied to the Indian grid. The power purchase agreement had been signed for the project on 31/07/2024 between SOLAR ENERGY CORPORATION OF INDIA LIMITED and CLEAN RENEWABLE ENERGY BARMER PRIVATE LIMITED. with rated capacity of renewable energy components as: Solar – 75 MWac; Wind Power – 79.2 MW; and ESS – 60/60 MW/60 MWh.

Registry page →
Methodology
Other
Country
India
Vintage
—
Rating
—
Issued (tCO2e)
—
Retired (tCO2e)
—
Retirement rate
—
CORSIA
na
Benchmark price
—
Implied unretired value
—
Ledger events
0
Status
GOLD_STANDARD_CERTIFIED_DESIGN

Methodology price benchmark

Weekly average USD/tCO2e for Other from the CIP price index.

No index history yet for this methodology.

Issuance vs retirement by year

Built from 0 normalized ledger events (0 issuance, 0 retirement).

No ledger events synced for this project yet. Feeds refresh daily — see feed status.

Peer projects — same methodology

Inquire about supply from this project

Submit a matching inquiry — we route to MBSB Markets.

Start an inquiry