GS23264-GS23271-RVPA-1 Recovery of metals and minerals from incinerator bottom ash in Switzerland
The project includes the construction and operation of a metal and mineral recovery plant in Switzerland. The plant has the capacity to process thousands of tons of incinerator bottom ash (IBA) from nearby incinerators on an annual basis. Around half of materials from the incinerator waste are set to be recovered, among which is a significant share of valuable metals and mineral fractions. The recovered metal and mineral fractions are sold downstream and therefore re-enter the economic cycle. The activity results in the reduction of emissions through the replacement of virgin materials in manufacturing, avoiding emissions involved in the extraction and processing of such materials. RVPA-1 follows the implementation of VPA-1.
Registry page →Methodology price benchmark
Weekly average USD/tCO2e for Energy Efficiency - Industrial from the CIP price index.
No index history yet for this methodology.
Issuance vs retirement by year
Built from 0 normalized ledger events (0 issuance, 0 retirement).
No ledger events synced for this project yet. Feeds refresh daily — see feed status.
Peer projects — same methodology
Inquire about supply from this project
Submit a matching inquiry — we route to MBSB Markets.
Start an inquiry