← Rankings
Gold Standard · GS197via Gold Standard — Project Registry

Kizilcaterzi Wind Power Plant

OSRES Elektrik Üretim A.S. proposes to install Kizilcaterzi WPP with 12.8MW installed capacity in borders of Yeniköy village district of Sarköy, Tekirdag. Kizilcaterzi WPP will have 8 turbines. The total electricity production of the project is estimated as 42,048 MWh/year. Due to its significant contribution to climate change mitigation and sustainable development in the region, this project is expected to fulfil the requirements of the Gold Standard rigorously. According to the Gold Standard Toolkit, with an installed capacity of more than 15 MW, the project is a small project and also fits in Renewable Energy Supply category. Registered under GS2.2

Registry page →
Methodology
Wind
Country
Turkey
Vintage
2025
Rating
—
Issued (tCO2e)
38,959
Retired (tCO2e)
—
Retirement rate
0%
CORSIA
na
Benchmark price
—
Implied unretired value
—
Ledger events
3
Status
GOLD_STANDARD_CERTIFIED_PROJECT

Methodology price benchmark

Weekly average USD/tCO2e for Wind from the CIP price index.

No index history yet for this methodology.

Issuance vs retirement by year

Built from 3 normalized ledger events (3 issuance, 0 retirement).

Transaction ledger

DateEventQuantityVintageCounterpartySource
2026-08-19issuance18,4972025—gold-standard-credits
2026-08-19issuance1,4562023—gold-standard-credits
2026-08-19issuance19,0062024—gold-standard-credits

Peer projects — same methodology

Inquire about supply from this project

Submit a matching inquiry — we route to MBSB Markets.

Start an inquiry