Geres Wind Power Project, Turkey
Geres Elektrik Üretim A.Þ. plans to invest in to a new power project called Geres Wind Power Project, which consists of installation and operation of 27.5 MW wind power plant. The license of the project is issued by Energy Market Regulatory Authority (EMRA) in February 2012. The project is located in the district of Kýrkaðaç, city of Manisa, Turkey and the connection point is Sayalar - Akhisar Electricity Transmission Line. The estimated net electricity generation of the plant is 91,736 MWh per year. By the efficient utilization of the available wind energy project activity will replace the grid electricity, which is constituted of different fuel sources, mainly fossil fuels. The electricity produced by project activity will result in a total emission reduction of 56,866 tonnes of CO2e per year. While the project activity started on 01.07.2012 by signature of the equipment contract, construction work is planned in mid of 2013 and by the end of 2013, the
Registry page →Methodology price benchmark
Weekly average USD/tCO2e for Wind from the CIP price index.
No index history yet for this methodology.
Issuance vs retirement by year
Built from 2 normalized ledger events (2 issuance, 0 retirement).
Transaction ledger
| Date | Event | Quantity | Vintage | Counterparty | Source |
|---|---|---|---|---|---|
| 2026-11-12 | issuance | 45,645 | 2025 | — | gold-standard-credits |
| 2026-11-12 | issuance | 931 | 2025 | — | gold-standard-credits |
Peer projects — same methodology
Inquire about supply from this project
Submit a matching inquiry — we route to MBSB Markets.
Start an inquiry