Kores Kocadag Wind Power Project, Turkey
Kores Kocadağ Rüzgar Enerji Santralı Üretim A.Ş (Kores) invested into a new wind power plant under the licence of Kores Kocadağ Rüzgar Enerji Santralı Üretim A.Ş . Installed capacity and output capacity of the project was 17.5 MWm / 15 MWe respectively. Kores, with an aim to benefit more effectively from the wind of the project area decided to erect three more turbines, each with 2.5 MW power to increase project installed capacity to 25 MWm/25 MWe. The license of the project has been revised to reflect the changes on 2nd of July 2015. The annual electricity generation of the project is 70,400 MWh and the annual estimated emission reduction of the project for the first crediting period was 37,831 tCO2e and for the second crediting period the annual estimated amount is 39,512 tCO2e. The total estimated emission reduction is 276,584 tCO2e Also, the second crediting period will start on 24 December 2016 with 10 turbines with 25 MW total installed capacity. 1st crediting period:24/12/2009-23/12/2016 2nd crediting period:24/12/2016-23/12/2023
Registry page →Methodology price benchmark
Weekly average USD/tCO2e for Wind from the CIP price index.
No index history yet for this methodology.
Issuance vs retirement by year
Built from 1 normalized ledger events (1 issuance, 0 retirement).
Transaction ledger
| Date | Event | Quantity | Vintage | Counterparty | Source |
|---|---|---|---|---|---|
| 2026-07-28 | issuance | 47,199 | 2025 | — | gold-standard-credits |
Peer projects — same methodology
Inquire about supply from this project
Submit a matching inquiry — we route to MBSB Markets.
Start an inquiry