← Rankings
Gold Standard · GS1213via Gold Standard — Project Registry

Amayo Phase II Wind Power Project

The Project consists on the addition of 23.1 MW of capacity to the Amayo Wind Farm located in the province of Rivas, Republic of Nicaragua. The main objective of the Amayo Phase II Wind Power Project (hereafter, “Phase II") is to provide affordable electricity to the Nicaraguan grid by means of a renewable, clean, and cheap source: the wind. For this purpose, the project will make use of eleven 2.1 megawatt (“MW") Suzlon S88 V3 60HZ wind turbine generators and related equipment, for a total power capacity of 23.1 MW per year, that will be added to the existing wind farm (“Phase I"). The net power production provided to the national grid is expected to be approximately 98.6 GWh per year.

Registry page →
Methodology
Wind
Country
Nicaragua
Vintage
2025
Rating
—
Issued (tCO2e)
32,437
Retired (tCO2e)
—
Retirement rate
0%
CORSIA
na
Benchmark price
—
Implied unretired value
—
Ledger events
3
Status
GOLD_STANDARD_CERTIFIED_PROJECT

Methodology price benchmark

Weekly average USD/tCO2e for Wind from the CIP price index.

No index history yet for this methodology.

Issuance vs retirement by year

Built from 3 normalized ledger events (3 issuance, 0 retirement).

Transaction ledger

DateEventQuantityVintageCounterpartySource
2026-08-05issuance11,1122025—gold-standard-credits
2026-08-05issuance17,3052024—gold-standard-credits
2026-08-05issuance4,0202023—gold-standard-credits

Peer projects — same methodology

Inquire about supply from this project

Submit a matching inquiry — we route to MBSB Markets.

Start an inquiry