Sah Wind Power Plant
Galata Wind Enerji A.S. (GALATA) installed Sah WPP with 105 MWM/105 MWe installed capacity in Bandirma district of Balikesir and Karacabey district of Bursa, Turkey. The project WPP have 35 turbines of which 22 turbines are in Balikesir province, and 13 turbines are in Bursa province, each having an output of 3.0 MW. The total electricity production of the project is expected to be 341.275 MWh/year. Sah WPP has connected via a 35 km transmission line to the 154 kV Gobel Transformer Station and the generated electricity is supplied to Turkey’s national electricity grid."
Registry page →Methodology price benchmark
Weekly average USD/tCO2e for Wind from the CIP price index.
No index history yet for this methodology.
Issuance vs retirement by year
Built from 4 normalized ledger events (4 issuance, 0 retirement).
Transaction ledger
| Date | Event | Quantity | Vintage | Counterparty | Source |
|---|---|---|---|---|---|
| 2026-05-27 | issuance | 151,238 | 2025 | — | gold-standard-credits |
| 2026-05-27 | issuance | 3,086 | 2025 | — | gold-standard-credits |
| 2026-05-27 | issuance | 133,755 | 2024 | — | gold-standard-credits |
| 2026-05-27 | issuance | 2,729 | 2024 | — | gold-standard-credits |
Peer projects — same methodology
Inquire about supply from this project
Submit a matching inquiry — we route to MBSB Markets.
Start an inquiry