← Rankings
Gold Standard · GS2045via Gold Standard — Project Registry

Dren Wind Power Project

Dren Wind Power Project will be the 34 MW licensed grid connected wind power project which will be located near Dren Village of Demir Kapija and Gevgelija Province in North Macedonia. Within the scope of the project activity it is planned to install 10 units of wind turbines with a capacity of 3.4 MW each, but this is not final decision for turbine type. Dren Wind Power Project will be operational in the last quarter of 2020 with a capacity of 34 MWe. Kaltun Enerji DOO Skopje will be received the license of the project from Ministry of Energy which is valid for 35 years. It is planned that project will be functional in the fourth quarter of 2020. Goal is to produce annually 95,716,000 kWh electricity and reduce the carbon emission by approximately 61,588 tons. The project activity displacing the electricity generated by fossil fuel fired power plants by utilising the renewable resources so as to avoid environmental pollution and GHG emissions; contributing the economic development of the region by providing sustainable energy resources and strengthen wind energy sector know how in North Macedonia.

Registry page →
Methodology
Wind
Country
North Macedonia, Republic of
Vintage
2025
Rating
—
Issued (tCO2e)
21,516
Retired (tCO2e)
—
Retirement rate
0%
CORSIA
na
Benchmark price
—
Implied unretired value
—
Ledger events
2
Status
GOLD_STANDARD_CERTIFIED_PROJECT

Methodology price benchmark

Weekly average USD/tCO2e for Wind from the CIP price index.

No index history yet for this methodology.

Issuance vs retirement by year

Built from 2 normalized ledger events (2 issuance, 0 retirement).

Transaction ledger

DateEventQuantityVintageCounterpartySource
2026-06-12issuance21,0862025—gold-standard-credits
2026-06-12issuance4302025—gold-standard-credits

Peer projects — same methodology

Inquire about supply from this project

Submit a matching inquiry — we route to MBSB Markets.

Start an inquiry