← Rankings
Gold Standard · GS2584via Gold Standard — Project Registry

West Bakr Wind Farm Project

: The project, developed by Lekela Egypt Wind Power BOO (S.A.E.), aims to generate clean electricity through renewable wind energy for sale to the Egyptian Electricity Transmission Company (EETC). It involves the installation of 96 Wind Turbine Generators (WTGs) of 2.625 MW each, totaling 252 MW, located in Ras Ghareb, Red Sea Governorate, Egypt. Power generation is achieved via wind, a clean technology with no fossil fuel consumption or greenhouse gas emissions during operation. The project was commissioned on 13/11/2021 and is estimated to reduce anthropogenic GHG emissions by 531,674 tCO₂e annually, displacing approximately 1,197,600 MWh of primarily thermal/fossil fuel­ based electricity

Registry page →
Methodology
Wind
Country
Egypt
Vintage
2025
Rating
—
Issued (tCO2e)
374,679
Retired (tCO2e)
—
Retirement rate
0%
CORSIA
na
Benchmark price
—
Implied unretired value
—
Ledger events
2
Status
GOLD_STANDARD_CERTIFIED_PROJECT

Methodology price benchmark

Weekly average USD/tCO2e for Wind from the CIP price index.

No index history yet for this methodology.

Issuance vs retirement by year

Built from 2 normalized ledger events (2 issuance, 0 retirement).

Transaction ledger

DateEventQuantityVintageCounterpartySource
2026-10-27issuance367,1862025—gold-standard-credits
2026-10-27issuance7,4932025—gold-standard-credits

Peer projects — same methodology

Inquire about supply from this project

Submit a matching inquiry — we route to MBSB Markets.

Start an inquiry