Mersin Wind Power Plant with Energy Storage
Aksa Yenilenebilir Enerji Üretim A.Ş. plans to launch the Mersin Power Plant Project with Energy Storage a total installed capacity of 112.00 MWm/100.08 MWe, based on the Electricity Generation License obtained from the Energy Market Regulatory Authority on 20/03/2025. The project will be implemented within the borders of Üçoluk, Çukurasma, and Sütlüce neighborhoods in Gülnar District, Mersin Province, Türkiye. As part of the project, a wind power plant will be constructed, and a Battery Energy Storage System will also be established. The grid connection of the plant will be realized as a permanent connection to the 154 kV Akkuyu 380 Transformer Substation, and temporarily as a tap connection to the 154 kV Gezende–Taşucu transmission line. As it’s scheduled to be commissioned in October 2026, the Mersin WPP with Energy Storage is expected to supply approximately 400,320 MWh of electricity annually to the grid. Due to its renewable energy source, the wind power plant will also contribute to a reduction of approximately 249,880 tons of CO₂ equivalent emissions per year.
Registry page →Methodology price benchmark
Weekly average USD/tCO2e for Wind from the CIP price index.
No index history yet for this methodology.
Issuance vs retirement by year
Built from 0 normalized ledger events (0 issuance, 0 retirement).
No ledger events synced for this project yet. Feeds refresh daily — see feed status.
Peer projects — same methodology
Inquire about supply from this project
Submit a matching inquiry — we route to MBSB Markets.
Start an inquiry