*Rotor Elektrik Uretim Osmaniye Wind Farm

The Project consists of 54 wind turbines with a rated power of 2.5MW each, providing a total installed capacity of 135MW and an expected annual electricity generation of 466GWh. The turbines will be provided by GE Energy, and will be installed and operated by Rotor Elektrik Uretim AS. The wind turbines are of 85m hub height and 100m rotor diameter. The plant will be connected to the national grid through the 154kVA Bahçe Transformer Centre via a 7.5-km power transmission line.

Registry page →
Methodology
Wind
Country
Turkey
Vintage
2025
Rating
—
Issued (tCO2e)
173,490
Retired (tCO2e)
—
Retirement rate
0%
CORSIA
na
Benchmark price
—
Implied unretired value
—
Ledger events
4
Status
GOLD_STANDARD_CERTIFIED_PROJECT

Methodology price benchmark

Weekly average USD/tCO2e for Wind from the CIP price index.

No index history yet for this methodology.

Issuance vs retirement by year

Built from 4 normalized ledger events (4 issuance, 0 retirement).

Transaction ledger

DateEventQuantityVintageCounterpartySource
2026-09-17issuance157,5312025—gold-standard-credits
2026-09-17issuance3,2142025—gold-standard-credits
2026-09-17issuance12,4912024—gold-standard-credits
2026-09-17issuance2542024—gold-standard-credits