← Rankings
Gold Standard · GS1788via Gold Standard — Project Registry

SAKARYA BIOGAS POWER PLANT

A biogas power plant will be builded by Sakarya Entegre Kati Atik Yönetimi Anonim Sirketi which is a subsidiary of ERA Çevre, in boundaries of Sakarya Metropolitan Municipality, Turkey. The capacity of the power plant will be 5 MW and it will be the extension of a landfill gas power plant. In addition to the energy generation, there will be additional facilities in the project area. Some of these facilities are mechanical waste separation, waste derived fuel production, composite unit and an education center for the training of local people and the visitors.

Registry page →
Methodology
Biogas - Electricity
Country
Turkey
Vintage
2025
Rating
—
Issued (tCO2e)
123,720
Retired (tCO2e)
—
Retirement rate
0%
CORSIA
na
Benchmark price
—
Implied unretired value
—
Ledger events
6
Status
GOLD_STANDARD_CERTIFIED_PROJECT

Methodology price benchmark

Weekly average USD/tCO2e for Biogas - Electricity from the CIP price index.

No index history yet for this methodology.

Issuance vs retirement by year

Built from 6 normalized ledger events (6 issuance, 0 retirement).

Transaction ledger

DateEventQuantityVintageCounterpartySource
2026-08-05issuance1,1452024—gold-standard-credits
2026-08-05issuance56,1072024—gold-standard-credits
2026-08-05issuance1,0042025—gold-standard-credits
2026-08-05issuance49,2172025—gold-standard-credits
2026-08-05issuance3242023—gold-standard-credits
2026-08-05issuance15,9232023—gold-standard-credits

Peer projects — same methodology

Inquire about supply from this project

Submit a matching inquiry — we route to MBSB Markets.

Start an inquiry