← Rankings
Gold Standard · GS2581via Gold Standard — Project Registry

Halilbeyli Biogas Plant

Esa Biogaz Enerji Üretim A.Ş. (hereafter referred to as “Esa Biogaz”) plans investing into a new Biogas power project called Halilbeyli Biogas Plant (hereafter referred to as the “Project” or “Halilbeyli Plant”), which involves installation and operation of 6.176 MWm/6.000 MWe biogas plant. The project consists of 4 units whose capacitites can be expressed as 4x(1.544 MWm/ 1.500 MWe). The licence of the project was issued by Energy Market Regulatory Authority (EMRA) on 26/09/2019. The generated energy will be fed to the grid at Bağyurdu transmission line.

Registry page →
Methodology
Biogas - Electricity
Country
Turkey
Vintage
2024
Rating
—
Issued (tCO2e)
136,047
Retired (tCO2e)
—
Retirement rate
0%
CORSIA
na
Benchmark price
—
Implied unretired value
—
Ledger events
6
Status
GOLD_STANDARD_CERTIFIED_PROJECT

Methodology price benchmark

Weekly average USD/tCO2e for Biogas - Electricity from the CIP price index.

No index history yet for this methodology.

Issuance vs retirement by year

Built from 6 normalized ledger events (6 issuance, 0 retirement).

Transaction ledger

DateEventQuantityVintageCounterpartySource
2026-07-30issuance22,7222024—gold-standard-credits
2026-07-30issuance4632024—gold-standard-credits
2026-07-30issuance1,3072023—gold-standard-credits
2026-07-30issuance46,5612022—gold-standard-credits
2026-07-30issuance9502022—gold-standard-credits
2026-07-30issuance64,0442023—gold-standard-credits

Peer projects — same methodology

Inquire about supply from this project

Submit a matching inquiry — we route to MBSB Markets.

Start an inquiry